9.07.2011

Laguna Building + Construction Update


As mentioned in a previous post, we've been busy with residential projects under construction, and since things are moving along quickly, we thought we'd post a few photos of a local renovation and addition in Laguna Beach.
The initial deconstruction required the careful removal of the majority of the existing structure, while maintaining and reinforcing the non-conforming portions of the building in the sideyard setbacks.

With that process complete and the concrete footings poured and set, the framing has gone up relatively quickly, complete with a steel-framed cantilever that will not only add square footage to the master bedroom, but will optimize the ocean views
rough opening for window
steel frame for cantilever
some serious tube steel
ceiling height transition

Thanks for reading!
Jason + Lauren